Connectivity Plan Template vs a Professional Plan
Approved Document R includes a model connectivity plan in Appendix B. Here is what is in it, where people get stuck, and when it is worth having it prepared for you.
Request Your Quote or call 02475 095700Is there an official connectivity plan template?
Yes. Approved Document R Volume 1 (2022 edition) includes a model form connectivity plan in Appendix B, and Section 3 explains what it should contain. Developers may use the model form as it is or adapt it. You don't have to use it, but it's a good guide to what your building control body expects to see, and it's free to download from GOV.UK.
The model form has two parts:
- Part A is completed when gigabit-ready physical infrastructure is being installed (which is almost always). It records the site and dwellings, the network operator and connection, and where the infrastructure runs to: the network distribution point, a point as close as reasonably practicable, a likely future location, or the access point.
- Part B is completed only when you rely on an exemption: for example, when a gigabit connection can't be secured within the £2,000 per dwelling cost cap. It needs evidence from at least two suitable network operators, such as quotes, refusals or proof they didn't respond.
Filling in the template yourself
For a straightforward single plot with an operator already lined up, completing the model form yourself is perfectly possible. It works well when:
- you've already had a connection offer from a network operator
- the duct route from the plot to the street is short and simple
- you have site plans you can mark up to show the route
- no exemption or cost cap argument is needed.
The form itself isn't long. The time goes into gathering the right information and presenting it clearly enough that Building Control don't come back with questions.
Where people get stuck
- Not knowing where the infrastructure has to reach. RA1 has a tiered approach depending on land rights, and the plan has to explain why the infrastructure ends where it does.
- Weak operator evidence. To rely on the cost cap, you must have invited at least two suitable operators and kept their responses. Without that, you're treated as able to get a gigabit connection within the cap.
- Getting the cost cap wrong. The £2,000 includes VAT and is net of operator contributions, but excludes RA1 infrastructure and your admin costs. Mixing these up leads to the wrong conclusion.
- Unclear drawings. Approved Document R suggests schematic diagrams, site layout maps and written evidence. A route that only exists in someone's head doesn't help Building Control.
- Timing. The information should go in with your Building Regulations application or notice, before the relevant work starts, not after the slab is down.
Template vs professional plan: a quick comparison
| DIY with the model form | Prepared by us | |
|---|---|---|
| Cost | Free, plus your time | From £249.99 + VAT (standard plan) |
| Best for | Simple single plots with an operator agreed | Anyone who wants it done right first time, multi-plot sites, or cost cap and exemption cases |
| Operator evidence | You gather and present it | We tell you what's needed and set it out clearly |
| Building Control queries | You deal with them | Send them to us. We fix errors in our work at no extra charge |
What you get from us
We prepare your connectivity plan from the project information you give us: the site address, the number of dwellings, drawings and any operator correspondence. It follows the structure of the Approved Document R model form, so Building Control recognise it straight away. Every enquiry is reviewed by a real person, you get a fixed quote before anything starts, and you pay after the work is completed.
Related: what Building Control need for Part R and connectivity plans for self-builds.
Template questions
Where is the connectivity plan template?
The model form connectivity plan is in Appendix B of Approved Document R Volume 1 (2022 edition), available free on GOV.UK. Section 3 of the same document explains how to complete it.
Do I have to use the official model form?
No. Approved Document R says developers may use or adapt the model form. What matters is that the required particulars, and evidence for any exemption, reach the building control body.
When do I need Part B of the connectivity plan?
Only when you rely on an exemption, for example when no gigabit connection is available within the £2,000 per dwelling cost cap. Part B records the evidence from at least two suitable network operators and the connection that will be installed instead.
Get your connectivity plan sorted
Plans from £249.99 + VAT. Tell us about your project and we'll come back with a fixed quote. Nothing to pay until the plan is done.
Request Your Quote ↗